Compact and Low-Investment Design:
Ideal for micro entrepreneurship, rural projects, and small construction sites.
Simple Semi-Automatic Operation:
Mold vibration with manual assistance, operated efficiently by 2–3 workers.
Flexible and Multi-Purpose Use:
Adapts to various block types, suitable for small-scale engineering needs.
The small 4-40 semi-automatic block machine is a compact molding equipment designed specifically for micro entrepreneurship, rural building materials supply, and rapid production on construction sites. It adopts a "mold vibration pressure+manual assistance" operation mode, and can be completed by 2-3 people. With the advantages of low investment, easy to use, and multi adaptability, it has become the preferred equipment for individual entrepreneurship and small-scale engineering matching.
Item |
Value |
Type |
Hollow Block Making Machine, Paving Block Making Machine, Interlock Block Making Machine, Curbstone Block Machine |
Brick Raw Material |
Crushed stone, sand, cement, dust and coal fly ash, cinder, slag, gangue, gravel, perlite, and other industrial wastes. |
Processing |
Brick Production Line/Brick Molding Machine |
Brick size |
390*190*190mm, 400*100*200 mm, 400*120*200 mm, 200*100*60 mm, 300*150*100 mm, 400*150*200 mm, 240*115*90 mm, 200*200*60 mm, 150*150*100 mm, 400*200*200 mm, 230*220*115 mm |
Place of Origin |
Shandong,China |
Key Selling Points |
High-accuracy,easy handling,Long service life,High level of security, |
Core Components |
Pressure vessel, Engine, Gear, Motor, Pump, Bearing, Gearbox |
Weight (KG) |
900KG |
Voltage |
380V Customized |
Method |
Mechanical Vibration |
Automatic |
No |
Dimension(L*W*H) |
1200*1300*2200mm |
Exciting Force |
30KN |
Vibration frenquency |
2500(r/min) |
Main vibration form |
platform vibration |
Pallet Size |
850*450*20mm |
Molding Cycle |
40-45s |
Overall power |
6KW |
1. Rural/county-level individual brick factories/small-scale building materials sites
2. On site brick making at construction sites
3. Small batch customized block production
4. Small scale processing sites for solid waste resource utilization
1. Simple maintenance: no steam pressure, natural maintenance, no need to build steam pressure vessels and maintenance kilns, saving space and energy, high turnover efficiency.
2. Low initial investment: Only one 350 mixer is needed to start production, suitable for entrepreneurs with limited funds.
3. Efficiency and quality balance: The molding cycle is about 40 seconds per time, the density is uniform, the weight error is ± 3%, and it meets the requirements of load-bearing and non load-bearing walls.
4. Simple maintenance: No complex hydraulic and electrical control systems, daily cleaning and lubrication are sufficient; Strong universality of key components, easy procurement of accessories, and low maintenance costs
5. Stable and low-noise operation: Multiple spring isolation systems ensure smooth and low-noise operation, reducing the impact on the surrounding environment and extending the lifespan of the entire machine.
1. What payment methods are supported?
Alibaba platform payment
Bank transfer: Supports corporate account transfers (available for large orders, please contact customer service for confirmation);
Note: All payments are processed with SSL encryption to ensure the security of your funds and information.
2. Can you provide an invoice?
International orders: A commercial invoice will be provided and shipped with the goods for customs clearance purposes.
3. Are there discounts for large orders?
Yes! For bulk purchases or long-term cooperation customers, please contact customer service to apply for tiered discounts, customized solutions, or exclusive services. Specific discounts will be negotiated based on the product and order size.
4. What are the product usage steps? Is there a detailed user manual?
We will include a product manual, and remote video guidance is available during installation. Our professional customer service team will answer any questions you may have.
5. What is the product warranty period?
The product warranty is 1 year, core electrical components have a 6-month warranty, and the fiber tray has a 6-year warranty.
6. Are there any additional fees at the destination port? Who is responsible for them?
Common fees at the destination port must be settled by the consignee upon collection of the goods, including:
Terminal handling fee (D/O fee): Basic unloading and warehousing fees at the destination port;
Unpacking fee (for LCL shipments only): Shared among all LCL cargo;
Import duties and taxes: Customs duties and Value Added Tax (VAT), levied according to the regulations of the destination country's customs;
Demurrage charges: Storage delay fees charged by the terminal if the goods are not collected promptly after arrival.
7. How long after arrival at the port must the goods be collected? What are the consequences of not collecting the goods?
Collection time limit: The free storage period after the goods arrive at the port is usually 3-7 days (varies depending on the port);
Consequences of exceeding the time limit: Demurrage charges will be applied (accumulated daily). If the goods are not collected for more than 30 days, the terminal has the right to auction the goods as unclaimed cargo.
8. What if the goods are damaged, lost, or short-shipped?
Claim Requirements: Marine insurance must be purchased (strongly recommended for high-value goods);
Processing Procedure:
Inspect the goods immediately upon delivery. If any problems are found, take photos/videos immediately and obtain a damage certificate from the terminal;
Contact customer service within 24 hours to submit a claim application and supporting documents;
After verification by the insurance company, compensation will be paid within 7-15 business days based on the value of the goods.
Without insurance: The shipping company will only compensate according to international maritime law, with a limit of 8.33 Special Drawing Rights (SDR) per kilogram.